0.972 MW photovoltaic plant in Rymanów

Electricity generation from a grid-connected photovoltaic installation.

Design and construction of a 0.972 MW photovoltaic plant with grid connection, transformer substation, telecontrol and full commissioning.

Location
Rymanów
Client
AT2 SOLAR Sp. z o.o.
Category
Photovoltaics and renewables

Context and technical scope

A photovoltaic plant with a total capacity of 0.972 MW was designed, constructed and commissioned in Rymanów.

System purpose

Electricity generation from a grid-connected photovoltaic installation.

Completed scope of work

  • photovoltaic plant design
  • installation of 1,690 photovoltaic modules
  • installation of four inverters
  • electrical grid connection
  • transformer substation with telecontrol
  • installation and commissioning of the control system
  • full plant commissioning
  • acceptance records and documentation for the MIOZE register

Installations and systems

  • photovoltaic modules
  • inverters
  • transformer substation
  • telecontrol
  • control system

Technical parameters

Plant capacity
0.972 MW
Photovoltaic modules
1,690
Inverters
4 / 1 MW