0.972 MW photovoltaic plant in Rymanów
Electricity generation from a grid-connected photovoltaic installation.
Design and construction of a 0.972 MW photovoltaic plant with grid connection, transformer substation, telecontrol and full commissioning.
- Location
- Rymanów
- Client
- AT2 SOLAR Sp. z o.o.
- Category
- Photovoltaics and renewables
Context and technical scope
A photovoltaic plant with a total capacity of 0.972 MW was designed, constructed and commissioned in Rymanów.
System purpose
Electricity generation from a grid-connected photovoltaic installation.
Completed scope of work
- photovoltaic plant design
- installation of 1,690 photovoltaic modules
- installation of four inverters
- electrical grid connection
- transformer substation with telecontrol
- installation and commissioning of the control system
- full plant commissioning
- acceptance records and documentation for the MIOZE register
Installations and systems
- photovoltaic modules
- inverters
- transformer substation
- telecontrol
- control system
Technical parameters
- Plant capacity
- 0.972 MW
- Photovoltaic modules
- 1,690
- Inverters
- 4 / 1 MW