15 kV MV cable circuits from GPZ Wisze
Extension of the medium-voltage distribution system in Krosno.
Design and construction of 3.16 km of 15 kV MV cable circuits, including a rock-bore HDD crossing.
- Location
- Krosno
- Client
- PGE Dystrybucja S.A.
- Category
- Electrical power infrastructure
Context and technical scope
15 kV MV cable circuits were designed and constructed from GPZ Wisze to the Krosno Centrum 2 substation and the overhead line at Sikorskiego Street.
System purpose
Extension of the medium-voltage distribution system in Krosno.
Completed scope of work
- design of 15 kV MV cable circuits
- 3,160 m of MV cable routes and circuits
- 140 m HDD crossing through rock
- installation of three DN200 protective ducts
- connection between GPZ Wisze and the Krosno Centrum 2 substation
- connection between GPZ Wisze and the MV overhead line at Sikorskiego Street
Installations and systems
- 15 kV MV cable circuits
- connections to the existing MV network
Technical parameters
- Total circuit length
- 3,160 m
- HDD section
- 140 m
- Protective ducts
- 3 × DN200