Battery energy storage system for the Sieniawa water treatment plant
Energy storage and power supply support for water treatment infrastructure.
Supply and integration of a 300 kWh / 150 kW battery energy storage system for the Sieniawa water treatment plant.
- Location
- Sieniawa
- Client
- Gmina Miasto Krosno
- Category
- Battery energy storage systems
Context and technical scope
A connection-ready 300 kWh / 150 kW battery energy storage system and associated equipment were supplied for the Sieniawa water treatment plant.
System purpose
Energy storage and power supply support for water treatment infrastructure.
Completed scope of work
- supply of battery modules and BMS
- supply of the AC/DC inverter, protection devices and LV switchgear
- supply and fit-out of the containerised enclosure
- cabling, installation components and associated equipment
- implementation of the EMS monitoring and control system
- Modbus/SCADA integration with the local building management system
- technical, operating and warranty documentation
- operator training and handover for operation
Installations and systems
- BMS
- EMS
- AC/DC inverter
- LV switchgear
- Modbus/SCADA
Technical parameters
- Storage capacity
- 300 kWh
- Power rating
- 150 kW