Battery energy storage system for the Sieniawa water treatment plant

Energy storage and power supply support for water treatment infrastructure.

Supply and integration of a 300 kWh / 150 kW battery energy storage system for the Sieniawa water treatment plant.

Location
Sieniawa
Client
Gmina Miasto Krosno
Category
Battery energy storage systems

Context and technical scope

A connection-ready 300 kWh / 150 kW battery energy storage system and associated equipment were supplied for the Sieniawa water treatment plant.

System purpose

Energy storage and power supply support for water treatment infrastructure.

Completed scope of work

  • supply of battery modules and BMS
  • supply of the AC/DC inverter, protection devices and LV switchgear
  • supply and fit-out of the containerised enclosure
  • cabling, installation components and associated equipment
  • implementation of the EMS monitoring and control system
  • Modbus/SCADA integration with the local building management system
  • technical, operating and warranty documentation
  • operator training and handover for operation

Installations and systems

  • BMS
  • EMS
  • AC/DC inverter
  • LV switchgear
  • Modbus/SCADA

Technical parameters

Storage capacity
300 kWh
Power rating
150 kW