Telecontrol system for the Krosglass plant

Data exchange, monitoring and remote control of the photovoltaic installation in coordination with the PGE network.

Photovoltaic-system telecontrol using RS-485 buses, fibre optics, RT1 and RT2 panels and PGE SCADA integration.

Location
Krosno
Client
Krosglass S.A.
Category
Automation and control systems

Context and technical scope

A telecontrol system was delivered for the photovoltaic installation and electrical network at the Krosglass plant.

System purpose

Data exchange, monitoring and remote control of the photovoltaic installation in coordination with the PGE network.

Completed scope of work

  • approximately 85 m RS-485 bus from the RT2 panel to inverter F6
  • approximately 300 m fibre-optic cable from the RT2 panel to the MV switchgear
  • approximately 35 m wall-mounted fibre-optic cable
  • approximately 70 m RS-485 bus for MV switchgear analysers and protection devices
  • approximately 220 m of RS-485 inverter wiring
  • prefabrication and installation of RT1 and RT2 panels
  • antennas and switchboards for remote operation
  • configuration, as-built documentation, PGE SCADA integration, testing and acceptance

Installations and systems

  • telecontrol
  • RS-485
  • fibre optics
  • RT1
  • RT2
  • PGE SCADA
  • remote control

Technical parameters

Fibre-optic route
approximately 335 m
RS-485 buses
approximately 375 m