Speedway track safety system at the Legionów Street stadium
Speedway track protection and controlled technical access.
Reconstruction of the speedway safety barriers, including geometry adjustments, technical gates and energy-absorbing elements.
- Location
- Krosno
- Client
- Gmina Miasto Krosno
- Category
- Specialist infrastructure
Context and technical scope
The speedway track barrier system was reconstructed and its geometry adapted to the requirements of the Polish Automobile and Motorcycle Federation.
System purpose
Speedway track protection and controlled technical access.
Completed scope of work
- removal of 328 m of existing barriers
- construction of 136 m of barrier on the first bend
- installation of 190 m of energy-absorbing barrier on the straights
- three technical gates and two access gates
- barrier geometry adjustments and associated track surface works
Installations and systems
- speedway track barrier
- energy-absorbing barrier
- technical gates
Technical parameters
- Removed barriers
- 328 m
- New bend barrier
- 136 m
- Energy-absorbing barrier
- 190 m