Speedway track safety system at the Legionów Street stadium

Speedway track protection and controlled technical access.

Reconstruction of the speedway safety barriers, including geometry adjustments, technical gates and energy-absorbing elements.

Location
Krosno
Client
Gmina Miasto Krosno
Category
Specialist infrastructure

Context and technical scope

The speedway track barrier system was reconstructed and its geometry adapted to the requirements of the Polish Automobile and Motorcycle Federation.

System purpose

Speedway track protection and controlled technical access.

Completed scope of work

  • removal of 328 m of existing barriers
  • construction of 136 m of barrier on the first bend
  • installation of 190 m of energy-absorbing barrier on the straights
  • three technical gates and two access gates
  • barrier geometry adjustments and associated track surface works

Installations and systems

  • speedway track barrier
  • energy-absorbing barrier
  • technical gates

Technical parameters

Removed barriers
328 m
New bend barrier
136 m
Energy-absorbing barrier
190 m